Video Project: SBB Embrach-Pfungen

Video Project: SBB Embrach-Pfungen

Client

avisec-Team

Nath Heimberg: Video Content Producer Nath Heimberg: Video Content Producer
Adrian Mosimann: Project Management and Planning Adrian Mosimann: Project Management and Planning

The project

To make accessible, step-free boarding possible and to provide sufficient capacity for the future, SBB expanded the Pfungen trainstation. At the same time, they upgraded Embrach-Rorbas station. In Pfungen, an underpass was also replaced.

avisec documented the project with multiple timelapse cameras, adding to the footage with drone and video shots and highlighting key milestones with on-screen graphics. A highlight of the project was the Emil Egger crawler crane, which lifted several large structural elements.

Our solution

  • We installed three avisec Construction Camera Pro units to capture six months of time-lapse material, powered by solar energy.
  • There were multiple on-site film shoots between April 2023 and June 2024.
  • Our video producer programmed a drone route to create an aerial timelapse video.

Let’s talk about your project!